Current Projects
Soccer Field
- The Master Plan work is complete, and we are moving full speed ahead with a new SPSCC Soccer Field.
- McGranahan is our Design Firm for the project
- We have submitted four permits through the City of Olympia.
- Design is working on bid documents now and hope to be out to bid mid-November.
Building 34
- We are working to finish tenant improvements for the classrooms on the first and second floors.
- Updates will be out as soon as we get more information.
Building 35
- Project includes the replacement lab exhaust fan motor, controls upgrade, and retro-commissioning.
- The retro-commissioning will continue to the end of September.
- We identified two issues that we are adding to the project to get fixed:
- Changing out of the control cards and repair jam alarms.
- Rebuild two boilers
Energy Efficient Lighting Project
- We have received a grant to cover the cost of replacing non-LED lights in building 21, 22, 25, 34, 35, and throughout the campus pathways.
- Building 21 is complete
- Building 22 has three areas to complete
- Building 25 is complete
- Building 34 has one area complete
- Building 35 is near complete
- Site Lighting is complete
Building 22 Roof Leak
- Working with the original installer to get the leaks in the building fixed.
Angela Bowen Center Roof Leak
- Working with the original installer to get the leaks fixed.
- They came and cleaned the roof, and applied a fix to two areas that seemed to work.
- Still have one leak in the stairwell.
Building 23 MDF/IDF Cooling
- The current system has not been operational for some time.
- Will be replacing with a new Mitsubishi system.
- Waiting on equipment. Will begin work in December.
Projects on the Horizon
- Building 25 Elevator Controls Upgrade
- Retention Pond Replacement