Capital & Campus Projects

Capital & Campus Projects: October 2025

By SPSCC Facilities

October 27, 2025

Current Projects

Soccer Field

  • The Master Plan work is complete, and we are moving full speed ahead with a new SPSCC Soccer Field.
  • McGranahan is our Design Firm for the project
  • We have submitted four permits through the City of Olympia.
  • Design is working on bid documents now and hope to be out to bid mid-November.

Building 34

  • We are working to finish tenant improvements for the classrooms on the first and second floors.
  • Updates will be out as soon as we get more information.

Building 35

  • Project includes the replacement lab exhaust fan motor, controls upgrade, and retro-commissioning.
  • The retro-commissioning will continue to the end of September.
  • We identified two issues that we are adding to the project to get fixed:
    • Changing out of the control cards and repair jam alarms.
    • Rebuild two boilers

Energy Efficient Lighting Project

  • We have received a grant to cover the cost of replacing non-LED lights in building 21, 22, 25, 34, 35, and throughout the campus pathways.
  • Building 21 is complete
  • Building 22 has three areas to complete
  • Building 25 is complete
  • Building 34 has one area complete
  • Building 35 is near complete
  • Site Lighting is complete

Building 22 Roof Leak

  • Working with the original installer to get the leaks in the building fixed.

Angela Bowen Center Roof Leak

  • Working with the original installer to get the leaks fixed.
  • They came and cleaned the roof, and applied a fix to two areas that seemed to work.
  • Still have one leak in the stairwell.

Building 23 MDF/IDF Cooling

  • The current system has not been operational for some time.
  • Will be replacing with a new Mitsubishi system.
  • Waiting on equipment. Will begin work in December.

Projects on the Horizon

  • Building 25 Elevator Controls Upgrade
  • Retention Pond Replacement